The Karachi Water & Sewerage Corporation (KW&SC) has suspended the water supply to Union Councils 9, 10, 11, and 12 in Lyari Town following a major rupture in a 24-inch diameter main pipeline. While the rest of Lyari Town continues to receive water normally, KW&SC engineering and technical teams have initiated emergency repair work on the damaged line. Officials estimate that the maintenance process will take approximately 36 to 48 hours to complete, after which the water supply to the impacted areas will be restored in a phased manner.
DEBT DRAGNET | KW&SC Launches Massive Multi-Million Rupee Industrial Crackdown
Simultaneously, the water utility has launched a aggressive, city-wide enforcement campaign against chronic defaulters to recover outstanding dues. KW&SC teams are targeting commercial and industrial sectors that have failed to clear their utility bills. During a recent operation in Sector 28 of Landhi Town, authorities severed multiple high-volume water connections and sealed industrial premises that collectively owed over PKR 40 million (4 crores) to the corporation, signaling a zero-tolerance policy against non-payment.
MEGAPROJECT TRIUMPH | Mayor Wahab Unveils PKR 500M Lifeline For Malir
In a major development for the city’s infrastructure, Mayor Karachi Barrister Murtaza Wahab officially inaugurated a vital 5 MGD (Million Gallons per Day) water supply project for Gulshan-e-Hadid and its neighboring localities. The project was launched after the Steel Mills administration abruptly cut off the area’s water source. To permanently resolve this long-standing crisis, the city government laid a new 4-kilometer-long dedicated pipeline at a cost of PKR 500 million. Completed by KW&SC in a record timeframe of just two months, this strategic initiative is set to directly benefit a population of nearly 500,000 residents in the Malir district.